A bit of history
We moved out of the old corrugated changing rooms in June 1996 into our new clubhouse with 4 changing rooms, a smart club room and all mod cons.
An extension to provide additional storage and allow for the club room to be increased in size was added some 10 years later.
Never ones to stand still we intend to continue to improve our facilities for the benefit of our members and the wider sporting public. The list below is not exhaustive but these plans have all been approved, we just need some more cash...
We moved out of the old corrugated changing rooms in June 1996 into our new clubhouse with 4 changing rooms, a smart club room and all mod cons.
An extension to provide additional storage and allow for the club room to be increased in size was added some 10 years later.
Never ones to stand still we intend to continue to improve our facilities for the benefit of our members and the wider sporting public. The list below is not exhaustive but these plans have all been approved, we just need some more cash...
Facilities - Approved planning applications - In no order of priority (All subject to funding):
- Clock - we have full permission for a clock to be fitted on the pitch side roof of the extension. A clock is a traditional feature on a sports building but not at present a priority.
- Canopy - full permission granted to provide roofing over the patio area, this will allow spectators to watch matches under cover
- Patio doors - Permission granted to replace the patio doors from the bar and to move these forward. Internal rearrangements thereafter will increase the space available in the club room. This is now a priority project.
- 01/03/2017 - In conjunction with the Guernsey Cardiac Action Group and the Lions Club of Guernsey we have installed a Public Access Defibrillator near front doors of the club.
- 28/3/2018 - The patio has been extended to provide additional seating areas and a wall erected at the end of the patio to help alleviate wind issues off the coast.
- 31/3/2018 - With the exception of one of the garage units all lighting is now all LED providing a significant reduction in our electricity bills and helping to save the planet.
- 5/6/2018 - In time for the 2018 world cup we have upgraded both of the TV's in the bar by acquiring a new Samsung 65" and a 55" model.
- 31/1/2019 - We have recently revamped the heating and hot water system with the old oil boiler being replaced with an electric boiler and radiators.
- 31/3/2019 - Following the recent water leak the flooring throughout the changing rooms, toilets and lobby area has been replaced (see picture in gallery).
- 01/05/2020 - Dugouts - New perspex dugouts installed for pitch one. Old perspex dugouts moved to pitch two to replace the old wooden structures.